Carbon-Neutral Energy Production from Wind and Solar.
- 2012 – Centex installed a 1.5 MW Wind Power Project in Tamil Nadu. It was approximately equal to the energy consumed by Centex at that time.
- 2013 – Centex has installed a 1.25 MW Solar Power Project in Madhya Pradesh. A total 2.75 MW is approx. equal to our present requirement.
- 2014 – We are planning to install a further 5.00 MW Solar Power Plant. Once installed the plant would supply all our energy for the next 25 years.